Project Name:
Power Plant Automatic Startup/Shutdown
Facility:
Combined-Cycle Units – TX / MS / OK
Project Scope:
Distributed Control System Engineering & Design. Provided complete engineering
services for the development of control system logic to fully automate the
power plant startup and shutdown control sequence. The plants’ DCS logic
was retro-fit to allow automatic sequencing of the balance of plant control
for a fully automatic startup and shutdown from a ready or operational condition.
![]()
Project Name:
Seo-Inchon Power Facility
Facility:
Korea Electric Power Co.
Project Scope:
Control System Engineering & Design. Provided control system engineering,
B.O.P.
plant instrumentation, and control valves and developed calculations for plant
controls (set-points, spans, valve sizing, etc.). The facility is powered
by eight (8) GE Frame 7 Combustion Turbines, eight (8) Heat Recovery Steam
Generators, and four (4) GE Steam Turbines, producing a total of ~2000 MW.

Project Name:
NOx Control Systems
Facility:
Four Plants – Mid-West USA
Project Scope:
Control System Engineering, Design & Supply. Provide complete control
systems for
NOx control processes at 4 Coal Fired Power Plants in the mid-west USA. The
control system package
utilizes a Hybrid Controller with a full feature HMI graphics software. The
system is fully integrated with the existing power plant Distributed Control
System. ControlPoint provided the entire control system including engineering
and design, hardware and software specification, system procurement, assembly/fabrication,
logic programming, HMI configuration, and on-site system startup.
![]()
Project Name:
Entergy Power Corporation
Facility:
Pilgrim Station 600 MW Power Plant
Project Scope:
Responsible for performing Feedwater system dynamic analysis / calculations,
establishing valve test boundaries, participating in Factory Acceptance Test,
and providing field
technical consultation associated with the replacement of the feed water regulator
valves. ControlPoint engineers worked closely with power plant personnel and
the valve manufacturer to provide complete technical documentation.
![]()
Project Name:
Emergency Generation–Town of Wallingford, CT
Facility:
CMEEC / Power Generation Plant
Project Scope:
Electrical Design & Protective Relay Settings
Provided electrical engineering and design for four 2MW emergency electric
generators to relieve power supply concerns. Scope included electrical tie-in
to the grid, protective relay design and settings, grounding system, and coordination
of electrical controls. This project was design complete and on-line in a
four-week period under an extremely tight design / install schedule.
|
![]() |
|